Disassembled existing shed structure, multi floor modular buildings and associated infrastructures and transported all items to new location. Earthworks to replace foundations to suit new installation. Service trenching and excavations. Installation of new shed structure. Installation and complexing of multi floor modular buildings. Cabinet and furniture assembly and installation, concrete paving, patio roof supply and installation and the installation of synthetic turf.
All work was in accordance with the latest revision of Australian Standards and Codes of Practice (i.e. Work Health and Safety (Mines) Regulations 2022.; Mines Safety and Inspection Regulations, 1995) and in accordance with Fortescue specification.